Caixas de tratamento térmico de fornos de poços

Heat Treatment Baskets or Trays
December 11, 2025
Resumo: Este vídeo demonstra a configuração, operação e momentos-chave durante o uso típico de nossas bandejas de tratamento térmico anti-deformação 1.4848 para fornos de poços.Você vai ver como estas bandejas garantir aquecimento uniforme e circulação de ar ideal durante o recozimentoVamos percorrer o seu projeto estrutural, características do material e desempenho em ambientes de alta temperatura até 1200°C.
Recursos de Produtos Relacionados:
  • Construído a partir de materiais de liga resistentes ao calor de alta resistência, como Cr25Ni20 e 310S, para uma operação estável até 1200 °C.
  • Features excellent oxidation and corrosion resistance to prevent damage and ensure uncompromised workpiece quality.
  • Designed with optimized hole patterns for uniform contact with furnace atmosphere and enhanced heat transfer.
  • Incorporates anti-falling plates and ash guide plates to prevent slag from falling into the furnace chamber.
  • Offers high load-bearing capacity to support large batches of workpieces for mass production.
  • Boasts a smooth, wear-resistant surface to prevent workpiece adhesion and simplify cleaning.
  • Provides excellent deformation resistance to maintain stable shape during repeated heating and cooling cycles.
  • Available in standard, bottom-guided, and non-quenching types to suit various operational needs.
FAQ:
  • How should I provide an inquiry for these heat treating trays?
    Please provide details about your furnace, operating temperature, cooling method, and loading weight. It's better to include 3D drawings. We will then design product drawings and provide a quote accordingly.
  • What is the typical delivery time for these trays?
    Sample orders take 35 days after full payment, stock orders take 10 days, and OEM orders take 30 days after deposit receipt.
  • What after-sales service do you offer for the trays?
    We provide a 1-year warranty. If you find any defective parts initially, we will replace them with new parts for free in your next order.
  • What are the payment terms for ordering these trays?
    For payments up to USD 10,000, 100% is required in advance. For payments over USD 10,000, 50% T/T is required in advance, with the balance due before shipment.
Vídeos relacionados

Heat Treatment Baskets

Heat Treatment Baskets or Trays
December 08, 2025

Arc/Spiral Concrete Mixer Mixing Blades

Concrete Mixer Mixing Blades
December 02, 2025

Cast Drive Roller & Cast Link Belt

Heat-resistant Steel Castings
December 08, 2025

Radiant Tubes

Radiant Tubes
December 08, 2025

Radiant Tubes

Radiant Tubes
December 08, 2025